Building Project
|
We have started our building project
in Boulwando. The foundation has been laid and the walls are
going up little by little. Slowly the villagers are getting back
behind the project. We are seeing more and more people
participating in the construction. We have one full week left
before we begin our slowdown mode; we will continue the building
project little by little as we commence the second semester of
the Institute on April 04, 2005.
Ésaïe OUÉDRAOGO has been acting as the project manager. Dominike
KONSIMBO has been responsible for the money disbursements.
Alexis KABORÉ has been the primary procurements man. Ghislain
NAGALO has been the wood worker; making the molding frames and
also has been charged with the iron works. Vincent BADO and Paul
SAYOUGA have been the faithful laborers. All have been charged
with the evangelizing, preaching, teaching, discipling, and
edifying the members and visitors of the Fundamental Baptist
Church of Boulwando.
Here are a few pictures of the building
project. The latest pictures are at the bottom. |
 |
Bricks have to be molded
and then watered for seven straight days before
being used. It is projected that we will have over
3,600 bricks, (?), and a total of just over ten tons
of cement for this building.
(Taken March 16,
2005)
|
One of the elders of the
village with Dominike, Harouna KONSIMBO, and Hamado
KONSIMBO laying the foundation.
(Taken March 16,
2005)
|
 |
|
| |
|
Here is the foundation
being laid (Taken March
16, 2005) |
|
|
 |
 |
|
Yamba KONSIMBO
and Alexis looking
at the freshly poured foundation.
(Taken March 16,
2005) |
Hamado, Yamba,
and Dominike mixing the sand, gravel and cement to pour
into the foundation.
(Taken March 16, 2005) |
|
 |
Harouna KONSIMBO, the most
faithful member of the construction crew, mixing the
cement.
(Taken March 16,
2005)
|
|
|
|
|
|
Ésaïe laying the final
row of bricks. (Taken
March 25, 2005) |
| |
Ghislain, with the aid of
Vincent, placing the iron bars together for the
corners.
(Taken March 25,
2005)
|
 |
 |
Harouna handing up cement
to Ésaïe as he is laying the bricks. Hamado is
assisting Ésaïe.
(Taken March 25,
2005)
|
Yembi assisting Ésaïe in
laying of the rows of bricks. His wife, Elène
OUÉDRAOGO, was baptized several weeks ago. Harouna
and Yamba are also assisting.
(Taken March 25,
2005)
|
 |
 |
A view of the building
project with our hanger to the right. All is
situated on the church property.
(Taken March 25,
2005)
|
|
| |
|
The following pictures were taken June 12, 2005 |
 |
Here is our metal roof.
It took some time, as our knowledge of construction
is severely limited.

|
|
|
Below is the main room where we will hold
the services. The back door
goes into our children's Sunday School class and Junior Church. |
|
|
 |
This is the picture of the
outside. The children are getting ready for Junior
Church, which will be taught by Adama and Lokre.
|
|
Web
Editor - Don Tarvin
Updated 03 Apr 2007
|